Case Studies

Deployment paths shaped around real inspection operations.

These examples show how ZhongLi helps public programs, OEM plants, and independent operators match equipment choices to throughput, rollout timing, and site constraints.

Government inspection station
GovernmentCase 1

Regional Public Inspection Upgrade

A public inspection operator needed steadier throughput and a clearer replacement path without shutting down its existing service window.

Challenge
Fragmented standalone stations with uneven throughput.
Solution
Modular lane redesign with phased replacement.
+32%Throughput
14wkCycle
View Case Study
OEM inspection plant
OEM PlantCase 2

End-of-Line Verification for OEM

An OEM line wanted more repeatable end-of-line verification without adding operational friction for production staff.

Challenge
Need higher verification consistency before release.
Solution
Integrated brake, speed, and side-slip modules.
-21%Scrap Risk
10wkGo-live
View Case Study
Independent testing center
IndependentCase 3

Single Station to Multi-Lane

An independent operator needed a staged growth plan that would start with one profitable station and later expand into a broader lane offering.

Challenge
Budget-driven expansion without service disruption.
Solution
Start from core and extend with compatible modules.
2.4xCapacity
3Lanes
View Case Study